Project Engineer - Data Center Construction (Mesa)

360X Staffing

MesaFull-timeMid LevelOn-site

Job Description

A well-established leader in the data construction space has an immediate opening for a Project Engineer at a ground-up construction site in East Mesa. This is a contract assignment with an expected duration of 3 months. The Project Engineer is expected to be on site 5 days a week.

Hourly pay with some OT anticipated. Strong consideration will be given for permanent employment for anyone that fills the role effectively during the contract period. Job Description: Project Engineer (Contract) Project: Mission Critical / Data Center Campus Location: East Mesa, AZ (On-site / Job Trailer) Schedule: 7am to 3pm (OT as needed) Reporting to: Project Manager Role Summary The Project Engineer is responsible for assisting in Project Management and Field Supervision to ensure this high-profile data center project is completed safely, on schedule, and within budget.

This role acts as a critical link between the office and the field team, facilitating seamless document control and subcontractor coordination. Essential Duties & Responsibilities Procore Management: Primary responsibility for managing RFIs and project submittals . Ensure all shop drawings and project plans comply with specifications and contract provisions.

Meeting & Admin: Prepare and distribute meeting minutes for weekly Staff and Owner/Architect/Contractor ( OAC ) meetings. Field Support: Assist the Superintendent with job site start-up, maintaining schedules, and completing accurate daily reports (including weather and subcontractor manpower). Project Controls: Assist the Project Manager with preparing the master cost breakdown, project close-out documents, and filing project photographs/safety logs.

Estimating Support: As needed, assist with Invitations to Bid ( ITBs ), soliciting trade proposals, and performing quantity take-offs. Safety Culture: Visibly support and uphold strong safety culture by reporting concerns and complying with all site safety policies. Requirements Software Mastery: Expert-level proficiency in Procore is required.

Education: Degree in Construction Management, Engineering, or a related field (or an equivalent combination of education and experience). Experience: Previous experience with a General Contractor, preferably on Design-Build or Mission Critical/Data Center projects. Availability: Must be able to work on-site in East Mesa 5 days a week.

Ability to handle overtime (40+ hours) during the initial 1-2 months of the contract. License: Valid driver’s license with a satisfactory driving record.

Posted 1 weeks ago

Related Jobs

Related Searches

Apply Now